Product Blending Optimization Scheduling System
Check the News Section below for news items.
H/BOSS is designed especially for gasoline and distillate fuels blending operations. H/BOSS features the latest technology in scheduling, simulation, blending and non-linear optimization.
Event-driven H/BOSS is unique in its ability to combine both recipe generation and product scheduling into one integrated package. H/BOSS is applicable in both short and long range blend planning, is fast and efficient. Troubling "what if?" questions can easily be tested and analyzed.
H/BOSS consists of event-driven, multi period modules:
Use H/BOSS as a Scheduling LP for scheduling and optimization methods to decide the timing and sequential order for each blend, and optionally the tanks that should be used.
Schedule the movement of products into distribution channels, using H/BOSS as a Scheduling LP
Optimize blend recipes that meet product specifications while considering the availability of components from the refinery and tankage, using H/BOSS as a Blending LP.
H/BOSS has the flexibility to optimize operations in:
Refinery blending operations, when blending components are produced continuously.
Terminal blending operations, where blending components are from outside sources and inventoried in tanks.
A Windows-based user interface manages access to enter spreadsheet data, state-of-the art optimization modules, and output options. Solutions are provided in useful reports, operating instructions and screens with graphs and Gantt charts. H/BOSS can be connected to on-line blend ratio and blend property control systems.
Click here to view the online demonstration of H/Sched.
Gasoline/Distillate Scheduling & Blending with a new H/BOSS II
A major project is well along to produce H/BOSS II. This off-the-shelf software will combine the best features of H/BOSS (such as great graphics and interface to the Access database), the powerful editing of H/SCHED, and new schedule generation capabilities using ideas developed in both H/BOSS and H/SCHED. The results will be a new system, which will be advanced beyond anything that has previously existed.
Further details will be presented to attendees at both the MUG and MUGI user conferences. (8/11/98)
H/BOSS II Demonstrated at MUG
This project is nearing completion and demonstrations of parts of the system was possible. One demonstration showed the loading of the finished schedule into an Access Data Base and the many advanced graphics and reports provided. Another demonstration showed a completely automatic generation of an optimal schedule and the gasoline blends to meet nine separate product liftings. This was based on real plant and lifting data. HSI plans delivery of H/BOSS II later this year. (9/19/98)
H/BOSS II
H/BOSS II, our major new product scheduling and blending software, is
coming along very well. All the parts have been developed and tested. The week before last was spent in putting it all together and H/BOSS II is now working as a whole and generating good schedules. Currently we are completing loose ends, putting in finishing touches and doing thorough quality assurance testing.
H/BOSS II includes important new extensions of technology which are making H/BOSS II the world's leading software for scheduling gasoline and other product blending.
Some of the new achievements include:
- Simultaneous blending and scheduling modelling for better results
- Full user control of the schedule details
- Editing of all parts of the schedule
- New schedule generation features, new graphics, new editing
- Easier to learn and use
- Off-the-shelf software with full support
- Easier to configure and maintain by users
- Part of OmniSuite
Keep in mind that shortly you will have available the newest, world's best product blending and scheduling software from the world leader in refinery scheduling software. (1/18/99)
Schedule Generation
A further advance has been made in the generalized schedule generation module (SGM) of H/BOSS II.
The current SGM has been doing simultaneous optimization of both blending and scheduling. To this has now been added the simultaneous consideration of which product tanks to use and when to change grades in the product tanks. Trade-offs can be made automatically among such things as making larger blends in anticipation of several liftings, making a blend early to avoid a component tank overflow, making a large blend in a tank when header time is available, then lifting and then quickly reblending to a different grade to satisfy the next lifting, - and many more.
Our R&D is keeping our schedule generation as the state-of-the-art for those who want the best. This is a specialty area of HSI. Prospective users are invited to contact us for more details and a demonstration. (5/4/99)
H/BOSS II
A major new development in our product blending and scheduling software is the inclusion of lift optimization in the overall optimization. H/BOSS will determine the lift schedule which will optimize return. The lifts may also include a mixture of fixed liftings and discretionary ones for the MIP to do the fixed and select among the discretionary ones. (2/10/00)
Related topics:
GRTMPS LP System
Optimizers
H/ROSS
H/COSS
H/DARTS
Return to the top of page.
For more information about Haverly Systems, click here.
Haverly Systems, Inc. - Copyright 2003
|